Dingman Township Fee Schedule
(CLICK ON LINKS
BELOW)
SEWAGE DEPARTMENT
Note:
All fees listed below are for permits obtained prior to
commencement of the permitted activity. Permits
applied for after the fact will be subject to a fee of twice
the listed amount below. In addition, the Township
reserves the right to initiate other legal actions against
the violator as may be permitted under state and local law.
Application Fees
Application fee
for conventional or alternate on-lot or community
on-lot system with less than 2,500 square feet of
absorption area.
|
$ 475.00 |
Application fee
for conventional or alternate on-lot and community
on-lot systems with 2,500 square feet or greater
absorption area.
|
$
800.00 |
Application fee
for individual residential spray irrigation, drip
irrigation, ABS systems, and experimental on-lot
systems.
|
$
800.00 |
Application fee
for portable chemical toilets.
|
$ 15.00 |
Application fee
for other retaining tanks.
|
$ 475.00 |
Application fee to connect to a community system (per
structure)
|
$100.00 |
Repair
and Replacement Permits
Repair or
replacement to septic, aerobic, dosing, holding,
chlorine contact, or filter tank or distribution
box.
|
$ 100.00 |
Repair or
replacement of piping.
|
$ 30.00 |
Absorption area
repair or replacement.
|
$ 400.00 |
Repair or
replacement of drip or spray infiltration zones
(other than pipes)
|
$
800.00 |
Application fee
for experimental version of a recognized
conventional or alternate system when used for a
repair
|
same as
fee for the applicable conventional or alternate system |
Planning Approval Testing and Review Fees
First soil probe
per day.
|
$
150.00 |
Additional soil
probes performed the same day.
|
$ 75.00
each |
First percolation
test.
|
$150.00 |
Additional
percolation test same property/project.
|
$ 75.00
each |
Verification of
soil probes conducted by others
|
$ 50.00
each |
Planning module
review (and subsequent reviews if found deficient)
|
$ 20.00
/ edu |
Appeals
Appeals of denied
sewage permit by applicant.
|
1/2 of application fee |
All other sewage
related appeals.
|
$ 400.00 |
Special Testing
- when required by Section 7.2(a)(1) of the
Pennsylvania Sewage Facilities Act:
Performing
percolation test
|
$ 300.00 |
Verification of soil
probes
|
$ 50.00
per test |
Permit application
fee
|
$ 475.00 |
Engineering Review
Fees
Engineering review
fees (when necessary).
|
Fee
Reimbursement |
Reinspection / Resubmission Fees
Resubmission of
applications as determined by Sewage Department
policy
|
$ 50.00 |
Reinspection (also
applies to testing cancelled less than 48 hours in
advance)
|
$ 50.00 |
Note:
All fees listed below are for permits obtained prior to
commencement of the permitted activity. Permits
applied for after the fact will be subject to a fee of twice
the listed amount below. In addition, the Township
reserves the right to initiate other legal actions against
the violator as may be permitted under state and local law.
Single
Family Residential
Building Activity |
Fee |
Portion of Fee Due at
Application |
New Single Family Dwelling
Permit
Township Administrative Fee |
See
CII Fee
Schedule, plus
$ 150.00 |
$ 300.00
Non-refundable |
Additions/Alterations Permit
Township
Administrative Fee |
See
CII Fee
Schedule, plus
$ 100.00 |
$ 150.00
Non-refundable |
Decks & Detached Accessory
Structures, >300 SF
Township Administrative Fee |
See
CII Fee
Schedule, plus
$ 75.00 |
$ 125.00
Non-refundable |
Decks & Detached Accessory
Structures, <300 SF
Township Administrative Fee |
See
CII Fee
Schedule, plus
$ 50.00 |
$ 75.00
Non-refundable |
Generators, A/C Systems,
Electrical Upgrades
Township Administrative Fee |
See
CII Fee
Schedule, plus
$ 25.00 |
$ 50.00
Non-refundable |
Inground Pools
(includes electrical)
Township Administrative Fee |
See
CII Fee
Schedule, plus
$ 50.00 |
$ 100.00 |
Storable & Above Ground
Pools & Hot Tubs (includes electrical)
Township Administrative Fee |
See
CII Fee
Schedule, plus
$ 25.00 |
$50.00 |
Demolition of a Structure |
See
CII Fee
Schedule, plus
$ 25.00 |
$ 25.00
Non-refundable |
Stormwater Collection
Systems (when required) |
Reimbursement of Township
Engineer Fees |
|
All Other Permit Types |
See
CII Fee
Schedule, plus
$ 50.00 |
$ 50.00
Non-refundable |
NOTE:
All
Application/Review fees are payable at the time of
application and will be applied to the permit fee
upon permit issuance.
In addition to the
above, all building permits will be accessed a $4.50
Pennsylvania U.C.C. fee which is payable at the time
of permit issuance.
|
Non-Residential and Multiple-Dwellings
Building Fees
|
All commercial,
multiple-family dwellings, and buildings intended for
public occupancy
|
$ 200.00 Administrative fee PLUS
CII fees
from fee
schedule
Portion of Fee Due at
Application - $350.00 |
Change of Occupancy,
Accessory Buildings, Cell Towers, Wind Turbines, etc. |
$ 100.00 Administrative fee PLUS
CII fees
from fee
schedule
Portion of Fee Due at Application -
$200.00 |
In
addition to the above, all building permits will be
accessed a $4.50 Pennsylvania U.C.C. fee which is
payable at the time of permit issuance.
|
Appeals
to the Building Hearing Board
Appeals Meeting
|
Interpretational |
$
100.00 |
Time
Extension Request |
$ 50.00 |
Appeals Hearing
|
$ 250.00 |
Stenographic
deposit
|
$
200.00
|
Stenographic fees
in excess of the deposit paid are required to be
reimbursed to the Township by the applicant. Any
unused portion of the deposit will be refunded.
|
RV
Renovations / Modifications
[ back to top ]
ZONING
DEPARTMENT
Note:
All fees listed below are for permits obtained prior to
commencement of the permitted activity. Permits
applied for after the fact will be subject to a fee of twice
the listed amount below. In addition, the Township
reserves the right to initiate other legal actions against
the violator as may be permitted under state and local law.
Permanent Sign Permit Fees
Temporary Sign Permit Fees
Quantity of signs |
Bond
amount |
Application fee |
1 to 3 |
$ 25.00 |
$ 10.00 |
4 to 12 |
$ 50.00 |
$ 15.00 |
13 to 25 |
$ 100.00 |
$ 15.00 |
25 to 35 |
$ 150.00 |
$ 15.00 |
36 to 50 |
$ 200.00 |
$ 15.00 |
51 to 62 |
$ 250.00 |
$ 15.00 |
63 to 100 (maximum) |
$ 300.00 |
$ 25.00 |
Permit
Application Fees
Sign permit -
permanent signs
|
$ 200.00 |
Residential -
single family uses
|
$ 125.00 |
Residential -
multiple dwelling units
|
$ 75.00 per dwelling unit |
Residential -
accessory uses
|
$ 75.00 |
Non-residential
uses
|
$ 350.00 |
Non-residential
accessory uses
|
$ 250.00 |
Change of use
|
$ 275.00 |
No Impact
Home-Based Businesses
|
$ 100.00 |
Reinspection Fee
Conditional Use Hearing Fees and Bonds
Permit application
fee
|
Applicable fee
|
Hearing fee -
Single family residential use
Review fee escrow
|
$ 200.00
$ 125.00 |
Hearing fee -
Non-residential / multi-family
Review fee escrow
|
$ 400.00
$ 500.00 |
Stenographic
deposit
|
$ 200.00 |
NOTE:
Reimbursement
of Township engineering fees and advertising costs is required for
hearings before the Board of Supervisors. Review fee escrow
must be replenished when balance falls below 25% of original
amount required. Any unused portion will be refunded.
Stenographic
fees in excess of the deposit paid are required to be
reimbursed to the Township by the applicant. Any unused
portion of the deposit will be refunded.
Variance, Special Exception Uses, Appeals, and all other matters
brought before the Zoning Hearing Board (except curative
amendments) Hearing Fees and Bonds
Application fee
(when applicable)
|
Applicable fee |
Variance and
appeal hearing fee
|
$ 350.00 |
Special exception
hearing fee
|
$ 500.00 |
Stenographic
deposit
|
$ 125.00 |
NOTE:
Stenographic fees in excess of the deposit paid are
required to be reimbursed to the Township by the
applicant. Any unused portion of the deposit will
be refunded.
Variance, appeal, and special exception hearing fees
include up to two hearing sessions. A third and any
subsequent hearing session will be an additional
$100.00 each.
|
Curative Amendment Hearing Fees and Bonds
Hearing fee for up
to two hearing sessions
Review fee escrow
|
$ 2,000.00
$ 2,700.00 |
Stenographic
deposit
|
$ 400.00 |
Third and
subsequent hearing sessions (each session)
|
$ 500.00 |
NOTE:
Reimbursement of
Township Engineer, Solicitor, and Consultant fees and advertising costs is required
for hearings before the Board of Supervisors.
Review fee escrow must be replenished when balance
falls below 25% of original amount required. Any
unused portion will be refunded.
Stenographic fees
in excess of the deposit paid are required to be
reimbursed to the Township by the applicant. Any
unused portion of the deposit will be refunded.
Curative amendment
hearing fee includes up to two hearing sessions. A
third and any subsequent hearing session will be an
additional $500.00 each.
|
Certificates of
Non-Conforming Use
Application Fee
for Certificate of Non-Conforming Use
|
$ 75.00 |
[ back to top ]
PLANNING
DEPARTMENT
Subdivision / Land Development Submission Fees
Lot improvements
|
$ 45.00 plus
$15.00/resulting lot |
Subdivisions
|
$ 125.00 plus
$40.00/resulting lot |
Land developments
|
$ 175.00 plus $
3.00/100 sq. ft. of
building area |
Planning
modules - no exemption - Base Fee
|
$35.00
plus unit fee |
Unit fee -
first 50 lots / edu's
Unit fee -
next 50 lots (#51 thru 100)
Unit fee -
all additional lots (#101 +)
|
$15.00
per lot / edu
$ 10.00 per lot / edu
$ 8.00 per lot / edu |
Stormwater and/or
E&S Plans
|
$ 75.00 |
Review fee escrows
(lot improvements exempted)
Up to 5 lots
or 5,000 square feet of building area
6 to 15 lots
or 5001 to 10,000 square feet of building area
More than 15
lots or over 10,000 square feet of building area
|
$250.00
$
750.00
$
2,000.00 |
S.A.L.D.O. waiver hearings
Hearing fee
Review fee
escrow
Stenographic
deposit (when applicable)
|
$
150.00
$
200.00
$ 200.00 |
Sketch Plans,
Rezoning Requests, and Miscellaneous reviews -
Township Fee Reimbursement
|
NOTE:
Above fees are for
initial submissions, whether Preliminary or Final.
Fee for Final Submission following a Preliminary
Submission will be 75% of the total Preliminary fee
paid.
Reimbursement of
Township Engineer, Solicitor, & other Professional
Consultant review/inspection fees are required for
all of the above. Review Fee Escrow must be
replenished when balance falls below 25% of original
amount required. Any unused portion will be
refunded.
All submissions
listed above will also require payment of applicable
Pike County Planning Commission review fees.
|
[ back to top ]
ROAD
DEPARTMENT
Note:
All fees listed below are for permits obtained prior to
commencement of the permitted activity. Permits
applied for after the fact will be subject to a fee of twice
the listed amount below. In addition, the Township
reserves the right to initiate other legal actions against
the violator as may be permitted under state and local law.
An exception may be made for emergency repairs.
Permit
Fees
Driveway access
permit for entrance onto Dingman Township roads
|
$ 75.00 |
Modifications to existing permits
|
$ 50.00 |
[
back to top ]
WELL
DEPARTMENT
Note:
All fees listed below are for permits obtained prior to
commencement of the permitted activity. Permits
applied for after the fact will be subject to a fee of twice
the listed amount below. In addition, the Township
reserves the right to initiate other legal actions against
the violator as may be permitted under state and local law.
Application Fees
Well Permit
|
$ 100.00 |
Modifications to
Existing Wells
|
$ 50.00
|
[
back to top ]
RESEARCH FEES
Research Fees
Research fee (per
property)
|
$25.00 |
Computer
print-outs (per page)
|
$ 0.25 |
Document
certification
|
$ 1.00
($5.00
maximum) |
Faxed documents
per page
|
$ .25 |
Photocopying Fees
Photocopying, per
page 8.5 x 11
Photocopying, per
page 11 x 17
Photocopying, per
page (color, when available) 8.5 x 11
Photocopying,
oversized documents (over 8.5 x 11)
|
$ 0.25
$ 0.50
$ 0.75
$ 3.00 |
[
back to top ]
MISCELLANEOUS FEES
For any submission
or requests for Township approval that are not
specifically itemized herein, the applicant will be
responsible for reimbursement of all costs, including
but not limited to solicitor, engineer, consultants,
advertising, etc. that may be applicable.
For instances whee
construction activities are started prior to the
issuance of the applicable building, zoning, well,
sewage, driveway permits, and miscellaneous permits, the permit fee(s) for
each discipline shall be doubled. |
|
[
back to top ] |