SEWAGE DEPARTMENT TRAINING PROGRAM

How to Build an At-Grade Sewage Disposal System

 

EXAMPLE:

 

An At-grade bed under construction.  Note the upslope lateral is 1 foot from the perimeter of the aggregate.  The down slope lateral is only 3 feet from the upper and 6 feet from the lower perimeter of the bed.

Back      Next