SEWAGE DEPARTMENT TRAINING PROGRAM
How to Build an At-Grade Sewage Disposal System
EXAMPLE:
An At-grade bed under construction. Note the upslope lateral is 1 foot from the perimeter of the aggregate. The down slope lateral is only 3 feet from the upper and 6 feet from the lower perimeter of the bed.