SEWAGE DEPARTMENT TRAINING PROGRAM

How to Build an At-Grade Sewage Disposal System

 

The entire bed area (including the subsoil berm) is then covered with at least 8 inches of cover soil.

End view

Back      Next

 

Back to Program Index

Back to Home Page