SEWAGE DEPARTMENT TRAINING PROGRAM
How to Build an At-Grade Sewage Disposal System
Mark each absorption area stake at a point 6 inches above the ground surface. This represents the height of the top of the aggregate. Back Next Back to Program Index Back to Home Page
Mark each absorption area stake at a point 6 inches above the ground surface. This represents the height of the top of the aggregate.
Back Next
Back to Program Index
Back to Home Page