SEWAGE DEPARTMENT TRAINING PROGRAM
How to Build an At-Grade Sewage Disposal System
In the area in which the at-grade bed is to be installed, cut all trees as close to the ground as possible. Trees should be cut for at least 20 feet in each direction around the bed. Leave the stumps in place. Pulling the stumps will result in permit revocation.
Acceptable Not acceptable (pulled stump)