SEWAGE DEPARTMENT TRAINING PROGRAM

How to Build an At-Grade Sewage Disposal System

 

Using a multi-prong chisel plow or the teeth of a backhoe bucket, scarify the entire at-grade mound area. The area scarified should be larger than the outside dimensions of the completed mound.  The furrows of the scarified soil should be perpendicular to the slope of the ground.

A multi-prong chisel plow

 

Scarify an area bigger than the entire system area

 

     

Back      Next

 

Back to Program Index

Back to Home Page