SEWAGE DEPARTMENT TRAINING PROGRAM

How to Build an At-Grade Sewage Disposal System

 

The berm soil should extend out a minimum of 3 feet from the top of the aggregate then be graded to a 3 to 1 slope.  The berm should be a minimum of 12 inches deep over the aggregate.

Back      Next

 

Back to Program Index

Back to Home Page