SEWAGE DEPARTMENT TRAINING PROGRAM
How to Repair an Elevated Sandmound
4. Replace the lower 6 inches of the aggregate. Side view showing bottom 6 inches of aggregate added Aggregate being bucketed on the sand BACK NEXT Back to Program Index Back to Home Page
4. Replace the lower 6 inches of the aggregate.
Side view showing bottom 6 inches of aggregate added
Aggregate being bucketed on the sand
BACK NEXT
Back to Program Index
Back to Home Page