Editors Note: Below is a copy of the Fee Schedule proposed to be discussed at the public hearing on September 16, 2014. Please note that all changes relate to the Building Department fees. All other fees are remaining the same. Click here to see the existing fee schedule.
Dingman Township Fee Schedule
WHEREAS, the Dingman Township Board of Supervisors, Township of Dingman, County of Pike, Commonwealth of Pennsylvania, does hereby enact the following fee schedule:
Sewage Department (For Permits obtained prior to work other than emergency repairs)
Application fee for conventional or alternate on-lot or community
systems with less than 2,500 square feet absorption area. $475.00
Application fee for conventional or alternate on-lot systems with
2,500 sq.ft. or greater absorption area, & all community on-lot systems $800.00
Application fee for individual residential spray irrigation,
drip irrigation, and ABS systems. $800.00
Application fee for experimental on-lot systems $800.00
Application fee to connect to a community system (per structure) $100.00
Application fee for portable chemical toilets $ 15.00
Application fee for other retaining tanks $475.00
Resubmission fee for applications as determined by Sewage Dept Policy $ 50.00
Repair or Replacements:
To septic, aerobic, dosing, holding, chlorine contact, or filter tank,
or distribution box. $100.00
Repairs to piping $ 30.00
Absorption area repair or replacement $400.00
Repairs or replacement of drip or spray infiltration zones (other than pipes) $800.00
Application for experimental version of recognized conventional or alternate system
when used for a repair shall be the same as the fee for a new applicable system.
Planning Module Review Fee / Re-review fee $ 10.00/edu
Planning Approval Testing Fees:
First soil probe: $150.00
Additional soil probes performed same day $ 75.00 each
First percolation test $150.00
Additional percolation tests (same property) $ 75.00 each
Verification of soil probes conducted by others $ 50.00 each
Appeals of denied sewage permit by applicant 1/2 of application fee
All other sewage related appeals $400.00
Special testing when required by Section 7.2(a)(1) of the Pennsylvania Sewage Facilities Act:
Performing percolation test $300.00
Verification of soil probes, per test $ 50.00
Permit application fee $475.00
Engineer Review Fees (when necessary) Fee Reimbursement
Reinspection Fee also applies to testing cancelled less than 48 hrs in advance $ 50.00
Zoning Department: (For Permits obtained prior to work other than emergency repairs)
1. Sign permit (Permanent) $ 200.00
2. Sign Permit (Temporary): Quantity Bond Amount Application Fee
1 - 3 signs $ 25.00 $ 10.00
4 - 12 signs $ 50.00 $ 15.00
13 - 25 signs $100.00 $ 15.00
26 - 35 signs $150.00 $ 15.00
36 - 50 signs $200.00 $ 15.00
51 - 62 signs $250.00 $ 15.00
63 - 100 Max. $300.00 $ 25.00
3. Principal Uses:
Residential (single family) $ 100.00
Non-residential $ 250.00
4. Accessory Uses:
Residential (single & multiple family) $ 50.00
Non-residential $ 150.00
5. Home Occupations (No-Impact & Minor): $ 75.00
6. Permit Re-inspections $ 50.00
7. Change of Use: $ 200.00
8. Certificate of Non-conformance $ 50.00
9. Conditional Uses:* Zoning Application Applicable Fee Above
Residential - Hearing Fee $ 200.00
Review Fee Escrow $ 100.00
Non-Residential/Multi Family – Hearing Fee $ 350.00
Review Fee Escrow $ 375.00
Stenographic Deposit (all)** $ 150.00
10. Zoning Hearing Board hearings:
Zoning Application (if applicable) Applicable fee Above
Variance & Appeal Hearing Fee- includes 2 sessions $300.00
Special Exception Hearing Fee – includes 2 sessions $500.00
Third and subsequent hearing session (each) $100.00
Stenographic Deposit (all)** $125.00
11. Curative Amendments:*
Hearing Fee - includes two sessions $2,000.00
Review Fee Escrow $2,700.00
Stenographic Deposit** $ 300.00
TOTAL: $5,000.00
Third and subsequent hearing session (each) $ 500.00
* Reimbursement of Township Engineer Fees is required for hearings before the Board of Supervisors. Review Fee Escrow must be replenished when balance falls below 25% of original amount required. Any unused portion will be refunded.
** Stenographic fees in excess of the deposit paid are required to be reimbursed to the Township by the applicant. Any unused portion of the deposit will be refunded.
Building Department: (For Permits obtained prior to work other than emergency repairs)
Single Family residential: Fees:
y
New Single Family dwelling Permit:
See CII Fee schedule attached, PLUS
Township Administrative fee
$150
Portion of fee due at application: ($300.00 non-refundable)
y
Additions/Renovations/Alterations Permit: See
CII Fee schedule attached, PLUS
Township Administrative fee
$100
Portion of fee due at application: ($150.00 non-refundable)
y
Decks & detached accessory structure (300 sf & over) See CII Fee
schedule attached, PLUS
Township Administrative fee: $ 75.00
Portion of fee due at Application ($125.00
non-refundable)
y
Decks & detached accessory structures (under 300 sf)
See CII Fee schedule attached, PLUS
Township Administrative fee $ 50.00
Portion of fee due at Application ($ 75.00
non-refundable)
y
Generators, A/C systems, electrical upgrades, etc: See CII Fee
schedule attached, PLUS
Township Administrative fee: $ 25.00
Portion of fee due at Application: ($ 50.00
non-refundable)
y
Pools / Hot Tubs (includes
electrical) See CII Fee Schedule
attached, PLUS
Township Administrative fee:
- Storable, above ground, hot tubs $
25.00 ($ 50.00 due at application)
- In-Ground
$ 50.00 ($100.00 due at application)
y
Demolition of a structure See
CII Fee Schedule attached, plus
Township Administrative fee: $ 25.00
(non-refundable)
y
All Other permit types: $
See CII Fee Schedule attached, PLUS
Township Administrative fee: $ 50.00
(non-refundable)
y Stormwater Collection Systems (when required) Reimbursement of Township Engineer fees
Non-Residential & Multiple-Family Dwellings:
y
All commercial, multiple-dwellings, and
buildings $200.00 Administrative Fee PLUS
intended for public
occupancy CII fees from
attached Schedule
Portion of fee due at Application $350.00
y Change of Occupancy, accessory buildings, $100.00 Administrative fee PLUS
Cell towers, wind turbines, etc. CII fees from attached Schedule
Ø All fees due at the time of application will be applied to the total permit fee upon permit issuance
Building CODE Board OF APPEALS:
Extensions of Time (permits) $ 50.00
Opinion Requests $100.00
Hearing Fee $250.00
Hearing Stenographic Deposit** $150.00
** Stenographic fees in excess of the deposit paid are required to be reimbursed to the Township by the applicant. Any unused portion of the deposit will be refunded.
Well Department: (For Permits obtained prior to work other than emergency repairs)
All well permit fees $ 100.00
Driveway access / New Permit $ 75.00
ROAD ENCROACHMENT permit (Township roads) Modifications to existing permits $ 50.00
(For Permits obtained prior to work other than emergency repairs)
Research/Xerox Fees:
Faxed documents per page $ .25
Computer print-outs per page $ .25
Xerox Copy per page – 8½ x 11 & 8½ x 14 $ .25
Xerox Copy per page – 11 x 17 $ .50
Color copies (8½ x 11; when available) $ .75
Oversized documents Actual Cost + mileage
Subdivision / Land Development Submissions:
Lot Improvements: $ 35.00 plus $15.00/resulting lot
Subdivisions: $ 100.00 plus $40.00/resulting lot
Land Developments: $ 150.00 plus $3.00/100sq.ft.of bldg area
First 50 lots/EDUs $ 10.00 per Lot/EDU
Next 50 (#51-100) lots/EDUs $ 8.00 per Lot/EDU
All remaining (#101+) lots/EDUs $ 5.00 per Lot/EDU
Review Fee Escrows (Lot Improvements exempt):
Up to 5 lots or 5,000 sf building area $ 250.00
6 to 15 lots or 5001 to 10,000 sf bldg area $ 750.00
Stormwater and/or E&S Plans $ 75.00
SALDO Waiver Hearings: Hearing fee $ 100.00
Review Fee Escrow $ 175.00
Stenographic deposit $ 150.00 (when applicable)
Ø Above fees are for initial submissions, whether Preliminary or Final. Fee for Final Submission following a Preliminary Submission will be 75% of the total Preliminary fee paid.
Ø Reimbursement of Township Engineer, Solicitor, & other Professional Consultant review/inspection fees are required for all of the above. Review Fee Escrow must be replenished when balance falls below 25% of original amount required. Any unused portion will be refunded
Ø All submissions listed above will also require payment of applicable Pike County Planning Commission review fees.
FOR INSTANCES WHERE CONSTRUCTION ACTIVITIES ARE STARTED PRIOR TO THE ISSUANCE OF APPLICABLE BUILDING, ZONING, WELL, SEWAGE, DRIVEWAY PERMITS, THE PERMIT FEE(S) FOR EACH DISCIPLINE SHALL BE DOUBLED.
Be it hereby resolved on this ___ day of _September__ , 2014, to become effective immediately.
DINGMAN TOWNSHIP BOARD OF SUPERVISORS
______________________________________
Thomas E. Mincer
ATTESTED:
______________________________________
Dennis L. Brink
_________________________
Karen Kleist, Sec/Treas. ______________________________________
Kerry W. Welsh